WIND POWER GENERATORS
Similar to the solar projects, there are preferential long-term contract with EDC (15 year contract) and incentives for the wind energy (preferential feed-in tariff). A number of power generating plants in the country were launched within a period of only two years. BIO POWER is developing wind power projects.
Eco El
- Power – 5 MW Electric
- Investment – 6 M EUR
- Status – construction permit granted
- Construction start date – 2009
- Exploitation start date – 2010